Free Quote on Any Order — Call us today for expert advice and a no-obligation quote on your retaining wall project.
Australia's Retaining Wall Specialists
Quality concrete sleepers & steel posts delivered Australia-wide
$49.00
Add your deal, information or promotional text
No products found in this collection
Retaining Walls Direct supplies hot-dip galvanised C-channel and PFC steel posts direct to Mackay and Central Queensland — delivered by crane truck to your site across Mackay, North Mackay, South Mackay, Andergrove, Beaconsfield, Sarina, Proserpine, Bowen, Moranbah, and surrounding areas. No depot markups, no middlemen — direct-to-site pricing with freight calculated at checkout.
With over 50 years of hands-on retaining wall construction experience across Australia, we understand where C-channel and PFC posts fit into Mackay retaining wall construction. C-channel posts are the correct choice for wall ends, corners, returns, and step-down sections. On Mackay's Pioneer River valley clay sites, wall ends and corners are high-stress points where intense wet season rainfall concentrates lateral force — correctly sized C-channel posts at these locations are critical to overall wall integrity.
On Pioneer River valley sites, footing holes may fill with water during the wet season — pour concrete immediately.
All our C-channel and PFC posts are hot-dip galvanised to Australian standards. Mackay's combination of tropical humidity, salt air within 5km of the coast, and cyclone wind loading (Wind Region C) creates one of Australia's most aggressive corrosion environments for steel. Hot-dip galvanising is the minimum standard for all Mackay retaining wall posts.
In Queensland, retaining wall approvals are governed by the Building Act 1975 (QLD):
Mackay falls under Mackay Regional Council. Proserpine and Bowen fall under Whitsunday Regional Council. Always confirm cyclone wind region requirements before commencing work.
Yes — wall ends require a closed-face post to contain the sleepers and provide a clean termination. On Mackay's Pioneer River valley clay sites, use 200 Series C-channel posts at all wall ends and corners for walls over 600mm — matching the 200 Series H-beam posts used in the main wall run.
Moranbah and the Bowen Basin sit on deep black cracking clay (Vertosol) — Class H2 reactive. 200 Series C-channel posts are mandatory for all corners and wall ends on Bowen Basin sites without exception.
C-channel posts can be used for short wall runs, but H-beam posts are structurally superior for the main wall run on Mackay's clay and Pioneer Valley sites. Use H-beam posts for the main run and C-channel posts at ends, corners, and returns only.
Yes — we deliver to Proserpine, Bowen, Moranbah, and surrounding Central Queensland areas. Freight is calculated at checkout. For remote Bowen Basin deliveries, contact our team to confirm crane access and lead times.
