AS 4678 Certified | Trade Accounts Welcome | Many Years Industry Experience

AS 4678 Certified | Trade Accounts Welcome | Many Years Industry Experience

Dy-Mark Spot Marking Paint 350g
Geo Matting | Geotextile Fabric for Retaining Wall Drainage
Ag Pipe 100mm x 20m | Slotted & Socked Drain Coil
Galvanised Steel Post Caps
Galvanised Steel Fence Bracket Kit
Builders Line Nylon Pink 100m

Material Estimator

SuperSleeper Composite Retaining Walls

No products found in this collection

SuperSleeper is a fibre-reinforced polymer retaining wall system. Sleepers, posts, caps, brackets and drainage are designed around each other, so a wall goes up as a kit rather than as parts from four suppliers. It is the composite alternative to the familiar concrete sleeper and steel post wall.

What fibre-reinforced polymer actually is

FRP is a polymer matrix reinforced with fibres — usually glass, sometimes carbon, aramid or basalt. The fibres carry the tension, the polymer holds them and keeps water out. There is no steel inside it, and that one fact explains most of the difference over a wall's life: steel reinforcement is what eventually rusts, expands and spalls the face off a concrete sleeper.

Why the weight changes a job

A 2.35 metre sleeper weighs 5.4kg. One person lifts it off the stack and drops it into the posts. No machinery hire to sling courses into place, no two-person lift on every piece, and far less tonnage on the truck.

Being straight about the money: the product costs roughly what concrete costs. The saving is in freight and installation, not the unit price.

The range

Component What it does Weight
SuperSleeper 1950mm Standard sleeper. Easier in tight access, less waste around corners and steps 5.4kg
SuperSleeper 2350mm Long-span sleeper. Fewer posts and fewer joints on straight runs 5.4kg
SuperPost 120H Intermediate post for straight runs, walls up to 1000mm 5.9kg
SuperPost 180H Intermediate post for taller walls, up to 1600mm 17.1kg
SuperPost 120C Ends, corners and changes of direction, at any height 6.9kg
SuperCap Caps the top course. Weather protection and a finished line 1.7 - 2.1kg
SuperSupport Spreads vertical load under the bottom sleeper, or seats the cap 89 x 83 x 250mm
SuperWedge Plastic packer. Holds the sleeper tight to the post during install -
SuperBracket Fixes Colorbond, aluminium or timber fencing to the wall posts 0.642kg
SuperDrain 10mm drainage cell for behind the wall. 0.9m x 15m roll -

Which post does your wall need?

Open the one that matches the finished height you can see above ground. Posts are sized on exposed height, not on total length.

My wall is up to 1.0m

You want the SuperPost 120H at 5.9kg for the straight runs, with a SuperPost 120C at each end and corner. Most garden and terracing walls sit here. Under a metre you can usually build without engineering certification, though that depends on your council and on what sits behind the wall.

My wall is 1.0m to 1.6m

Step up to the SuperPost 180H at 17.1kg for the straight runs. Ends and corners still take the SuperPost 120C. Every wall in this band needs engineering certification and council approval regardless of what it is built from, so the design comes first and the materials list follows from it.

My wall is over 1.6m

1.6m is the ceiling for this system, so a taller wall is a different construction method rather than a bigger post. talk to us and we will point you at something that suits — or at an engineer, if the wall is at the stage where that is the sensible next call.

I am not sure, or the ground slopes

Sloping sites usually step the wall, and each step is measured separately. A driveway, shed, pool or a slope that keeps climbing behind the wall all count as surcharge and change the post sizing regardless of height. The retaining wall calculator asks what sits behind each run and flags when a wall needs engineering.

How a wall goes together

Posts first, set into concrete footings — SuperPost 120H or SuperPost 180H on the straight runs, SuperPost 120C at every end and corner. A SuperSupport at the base of each bay spreads the load into the ground instead of concentrating it on a sleeper edge. Sleepers stack between the post flanges, with a SuperWedge closing any gap. Drainage goes in as you build, not after. The SuperCap finishes the top and a SuperBracket carries any fence above it. how to build a sleeper retaining wall has the full sequence.

Drainage decides whether the wall lasts

Saturated soil weighs far more than drained soil and pushes far harder, and it is the most common reason walls fail — ahead of undersized posts, ahead of shallow footings. SuperDrain gets water down the back of the wall, ag pipe carries it away at the base, geotextile fabric keeps soil out of the aggregate. The full set is under drainage kits, ag pipe and weep holes. why retaining walls fail and cracks and when to worry cover what happens when this gets rushed.

Painting and maintenance

Standard grey is the only factory finish, so painting is how you change the look. Prepare properly or it will flake: scuff with 220-grit, then an exterior polyurethane paint with UV protection. Epoxy is not recommended on fibreglass. Beyond that there is nothing to seal, re-stain or treat.

When composite is not the right answer

Over 1.6m, this is not the system. If you want a decorative finish — woodgrain, sandstone, a block face — our concrete sleepers do that and composite does not. how long retaining walls last by material compares how the materials age.

Testing, warranty and certification

What testing has it been through?

Independently tested through a NATA-accredited laboratory and at Queensland University of Technology. It is designed specifically to resist long-term deflection — the slow bowing that shows up in a wall years after it is built, long after anyone is still looking at it.

What does the warranty cover?

35 years on the SuperSleeper products. It covers the SuperSleeper components themselves and not steel posts, their design, materials, durability, embedment, spacing or installation.

Can I use steel posts instead of composite ones?

Yes, and it does not void the warranty, provided the SuperSleeper components are installed to the manufacturer's guidelines. Specifying and installing the post is then down to you and your engineer. We stock galvanised steel posts if that suits the job better.

Is engineering certification available?

Yes. The manufacturer can provide engineering certification for its products, and publishes technical guides written for engineers covering walls over one metre. Ask and we will pass them to your engineer.

What are the environmental credentials?

Around 75% less CO2 in manufacture than traditional materials, and an expected service life of up to 100 years installed and maintained correctly.

Work out what your wall takes

The retaining wall calculator turns your wall dimensions into sleeper counts, post counts and lengths, hole depths, concrete volume, drainage pipe and aggregate. It flags when a wall needs engineering, and it asks for your postcode so freight is in the number rather than added later.

How a quote works

  1. Run the wall through the retaining wall calculator, or just send us the lengths and heights.
  2. Tell us the delivery address and whether a crane truck can reach the wall. Access drives the freight more than distance does.
  3. We come back with a delivered total — materials and freight in one figure, usually within one business day.

What the quote includes

Every component for the wall you described, priced as a delivered total: sleepers, posts, the base supports, wedges, cap, fence brackets if you need them, and the drainage behind it. We quote the whole wall rather than a parts list, because a wall missing its drainage is the one that comes back. If something on the list is not needed on your job, say so and we will take it off.

Trade accounts

If you are a landscaper, builder or civil contractor, add your ABN when you send the wall through and we will quote at trade rates. Repeat and project work is priced on the whole job rather than line by line, so tell us if what you are sending is one stage of several.

Samples and technical documents

Ask and we will send the manufacturer brochure, the installation drawings and the install guide. If your engineer needs them, the technical guides covering walls over one metre and the engineering certification come from the same place. Worth getting those in hand before a wall over a metre is designed rather than after.

Delivery and payment

SuperSleeper is available in South Australia, Victoria, New South Wales, Queensland and Tasmania. It is not offered in Western Australia or the Northern Territory — there is no SuperSleeper manufacturer in WA, and freight in from SA or VIC would blow the price out. SA and VIC supply is locked in; NSW and QLD are still being opened, with freight running from SA or VIC in the meantime. If you are in WA or the NT, our concrete sleepers and galvanised steel posts cover the same job — ask and we will tell you what is possible. Freight is quoted to your postcode and site access, not estimated from a zone table. Payment is on order, so there is no account to open and no credit to arrange before materials move.

Everything in this range is quote-only. What you pay depends on your state, the quantity and the freight to your site, so a unit price on its own would not tell you much.

send us your wall dimensions and we will come back with a price on the lot.

Search